Midtown Engineers was selected by the Harris County Flood Control District (HCFCD) to provide final engineering design plans, specifications and a construction cost estimate (PS&E) in support of erosion repairs on Keegans Bayou from the confluence at Brays Bayou to US 59 (14,000 FT). Erosion repairs included rock trenches, rock toes, rock blankets and general cut/fill repairs. This project required an Interagency Local Agreement (ILA) between HCFCD and the City of Houston for the Hike & Bike Trail repair efforts. Our team provided extensive utility coordination to resolve fence encroachment (32 total) and utility encroachments with AT&T and Comcast along the south Right of Way.