A project spanning close to two miles of roadway, we were responsible for producing roadway plans for Section 4 of the Sam Houston Tollway Southeast. We provided geometric design, section design with separate plans for...
July 22, 2019 3:30 pm
Published by limb_admin
From FM 2920 to Montgomery County Line, we coordinated utilities for the second phase of the Tomball Tollway with Level D-A Subsurface Utility Engineering (SUE). The project scope included creation and development of contact lists,...
July 22, 2019 2:56 pm
Published by limb_admin
A 12-mile-long project that involved utility coordination and level D-A SUE, it began with records research (SUE Level D), field investigations (SUE Level C) and coordination efforts with all identified utilities within the area. We...